HPT

 

6.0 Lanes and Switches:

6.1Lanes:

The Hybrid PT System requires at least one Main Grid Rail in each direction. Where necessary, multiple lanes in each direction may be constructed. Eight Grid lanes can be constructed above the same space occupied by 4 highway lanes.