HPT

 

18.0 Standard Protocol - Government Grant:

18.1Immediate Testing:

With the help of the U.S. Department of Transportation, automakers and computerization experts, the Company believes it can develop a Hybrid PT vehicle and System design which is suitable for immediate testing and further study. The problems associated with multiple designs and implementations of toll plaza automatic collection systems (Smart Pass, etc.), leads the Company to believe that one standard (or protocol), should be developed using all available input from all available sources including the Federal Government.

18.2FTA Grand Funds:

The Company expects to apply for Federal Transit Authority Grant funds to assist with the initial costs of design and development of the Hybrid PT System. Construction and implementation is expected to be funded by public financing once a standard protocol is adopted for both Hybrid PT vehicles and infrastructure. The U.S. Department of Transportation will be invited to participate in Grid vehicle, and Grid System, design as part of a partnership to utilize Interstate Highway air rights effectively.